Snapshot of some of the projects members of the Semic Team has worked on.
CLIENT | PROJECT |
---|---|
A&A Mechanical Contractors | Removal of 48” riser pipeline and installation of new 30” x 60‘ riser pipeline. |
ALCOA | Installation of Impressed current anodes. |
ALNG | Maintenance dredging of ALNG channel and basin. |
ALNG | Survey of construction channel and dock-ALNG , Point Fortin. |
APAN Construction Company | Engineering designs for new port development along Essequibo River at Parika, Guyana. |
APAN Construction Company | Geotechnical Investigation including Engineering Analysis at a site along the Esequibo river for proposed port development. |
ASCO (Trinidad) Limited | Geotechnical investigation including bearing Capacity Analysis within Marshalling Area at Chaguaramas Shorebase facility for the purpose of installation of Bulk Cement Silos. |
ASCO (Trinidad) Limited | Geotechnical investigation including analysis of allowable bearing capacity at MHL Shorebase facility for cargo storage. |
ASCO (Trinidad) Ltd. | MHL Shorebase Chaguaramas - engineering design of new mooring bollards for existing berth 250 ft long. |
ASCO (Trinidad) Ltd. | Labidco Berth 3 - Analysis of dock loading including design of crane pad to facilitate heavy lift of subsea XT. |
ASCO (Trinidad) Ltd. | La Brea Berth 1 - structural analysis of existing dock in order to determine allowable capacity to facilitate crane. |
Atlantic LNG | Design of tug moorings. |
Atlantic LNG | Coastal Protection Works, Point Fortin - bathymetric and current survey; design water level analysis; wave analysis using Jonsey and Outray software; sea wall, revetment and breakwater design. |
Atlantic LNG/BECHTEL | Survey of ALNG channel and turning basin. |
Baroid Trinidad Services | Crondstadt Island Port Facility - dock inspection including recommendations for repair and upgrade. |
Baroid Trinidad Services | Chaguaramas Shorebase - Design, fabrication and installation of 20T mooring bollards. |
Bourbon Marine and Logistics Ltd. | Hull clean, propeller polish and ABS Underwater class inspection on Bourbon Liberty 162. |
BPTT | Dredging the approach channel and harbour at Galeota Point. |
British Gas | Survey for BPTT/Galeota Point. |
British Petroleum/ALNG | Clifton Hill-supervision of installation of 420 meters of sheet piles/breakwater on the Clifton Hill Sea Wall Project. |
C.R. Boodoosingh and Sons | Sheet Piling wall/river dredge design and construct. |
Capital Signal Company Limited | Survey for EOG Dock, Chaguaramas. |
Capital Signal Company Ltd. | Design of anchored sheet pile wall for waterfront reclamation and development. |
Chagterms Trinidad Ltd. | Design of sacrificial anode system for existing sheet piled dock 300 m long. |
Chaguaramas Terminals Ltd | Design of open piled structure 100 m long to accommodate Rig Supply Vessels/Utility Vessels. |
Coastal Protection Unit/ CEAL Consultants | Construction, management and supervision of coastal protection works at North Cocos bay. Included installation of an anchored sheet piled wall and wave scour protection. |
Coastal Protection Unit/ Zeeton General Contractors | Construction, management and supervision of upgrade works to the Manzanilla Beach Facility. Works included installation of an anchored sheet piled wall. |
Crews Inn Ltd. | Crews Inn - design of sacrificial anode system for marina. |
D.W.A.S.C.O | Dominica-fabrication/installation/project management of outfall pipeline. |
Dale Ramadhar | Gulf View - Pool construction and patio/landscaping. |
Drainage division, Ministry of Works | Survey of Caroni River. |
EOG Resources | Design of new sheet piled dock at Chaguaramas. |
ETECK | Design of coastal protection and shoreline stabilization works for the Vanguard Hotel, Tobago. |
Gaslog LNG Services Ltd. | Hull Clean, Propeller Polish and ABS Class Inspection. |
Gov’t. of Barbados | Port of Barbados- Piling installation and supervision: concrete and tubes, airlifting, bulbing and concrete treme. |
Gov’t. of Barbados | Rockley Boardwalk Project: stone revement, breakwater, general works and heavy equipment coordination. |
Gov’t. of Saba | Saba-placement of Acropods and stone sheet piles at Fort Bay Harbor. |
Gov’t. of St. Lucia | Canaries jetty/Laborie jetty, St. Lucia- installation of piles. |
Gulfmark Offshore, Inc. | Underwater Inspection on Conti. |
HSMDT | Legacy Gated Community, Chaguanas -foundation to finish. |
IPSL | Quarterly cleaning and airlifting of silt around sea water pumps. |
ISIKA (Guyana) | Engineering designs for new port development along Demerara River at Versailles, Guyana. |
JADA Builders | Port of Barbados- Project Management for two offshore breakwater beachlands, installation of sheetpiles and 1000 m metal form. |
Kee-Chanona | Biche High School - Construction of retaining walls, paving, guard booth. |
LMCS | Installation of riser clamps. |
LMCS | Installation of seventy five (700 lbs) anodes onto steel piles. |
LMCS Ltd. | Petrotrin Berth 1- Design of piled fender Beam to facilitate berthing of oil tanker vessels. |
Mariners Haven Ltd. | Geotechnical investigation including bearing capacity analysis within open storage Pipeyard at Chaguaramas Shorebase facility. |
Ministry of Works and Transport | Maintenance Dredging of La Brea harbour. |
Ministry of Works and Transport | Desilting of Couva River mouth. |
National Energy Corporation | Underwater and Underside structural inspection of Savonetta Pier 1,2,3 and 4. |
National Energy Corporation | Quarterly cleaning of fire water pump strainers. |
National Gas Company | Survey of Brighton Coastline |
National Gas company | Survey of Point Lisas coastline-Point Lisas. |
National Petroleum Limited | Survey of NP channel and basin- Port of Spain. |
NEC | New Port at Galeota infrastructure design - dockside structures, port pavement, roads and drainage. |
NEC | Design of Fishing Port at Guayaguayare |
NGC | Liquid Fuels Pipeline Project - Civil Engineering and Structural Engineering Designs for the site at Caroni. |
NIDCO | Survey for water Taxi terminal-San Fernando. |
Oceaneering International Inc. | Provision of consumables for Oceaneering International ROV crew onboard Exxon Mobil drill rigs-Guyana |
Petrotrin | Dredging of Pointe a Pierre harbour. |
Petrotrin | Relocation of Trinmar Marine Base from Point Fortin to Mt. Pellier - maritime and structural engineering designs of open piled berth structures including dredging/reclamation, shoreline revetment and navigational access channel. |
Petrotrin | Investigation into collapse of stern line mooring dolphin. |
Pier One Marine | Engineering design of new anchored sheetpiled dock 220 ft long for berthing of vessels. |
Pier One Marine | Design of new jetty 300 ft long for the berthing of Platform Supply Vessels; work scope included topographic and hydrographic surveys. |
Pier One Marine | Design of sacrificial anode system to new sheet piled berth 80 m long. |
Pier One Marine | Design of sacrificial anode system to piles of new jetty. |
PLIPDECO | Survey for Savonetta Piers 1-4, Point Lisas. |
Polaris Contractors | PLIPDECO Berth 5 - design of dock and recommendations for repair work. |
Port Authority of Trinidad and Tobago | Dredging of Scarborough harbour. |
Port Authority of Trinidad and Tobago | Survey for Queens wharf, Port of Spain-Galleon Passage Dredging. |
Port Authority of Trinidad and Tobago | Survey for Scarborough Port. |
Port Authority of Trinidad and Tobago | Survey for Ferry Berth - Water Taxi Terminal. |
R&J Cell Tech Ltd. | Gulf View - Retaining wall/pavings. |
Rotterdam Public Works | Design of sacrificial anode systems for various harbours within the Port of Rotterdam (Netherlands) including Beatrix Harbour/Missippi Harbour/Amozon Harbour container terminal. |
Rotterdam Public Works - Netherlands | Dintelharbour - Structural design calculations for a 385m long new quay wall for the EECV coal handling terminal. |
Rotterdam Public Works - Netherlands | VOPAK Oil Terminal - design of flexible mooring/berthing dolphins for oil tankers. |
Royal Haskoning DHV | Underwater inspection of 80 steel piles at Brighton Port, La Brea. |
Safety Plus Limited | Construction of elevator shaft and installation of A/C system. |
Sapura Energy | Hull Clean and ABS Class inspection on SKD JAYA. |
Shastri Maharaj | Palmiste - Home Renovation. |
Shorelands CMC | Renaissance Towers at Shorelands - Design of marina to facilitate berthing of 40 vessels of length up to 80 ft. |
St. Vincent Port Authority | Repairs and Rehabilitation of Kingston Port access trestle. |
Tiger Tanks | Supply of labour for tank cleaning. |
TN Ramnath Ltd. | PLIPDECO - Berths 3 and 4 R.C. Coring at 10 ft. horizontal depth. |
TN Ramnath Ltd. | PLIPDECO - Berths 3 and 4 upgrade, land and marine piling and civil works. |
Tobago House of Assembly | Charlotteville Cruiseship Berth and Fishing Port - Engineering design. |
Tobago House of Assembly | Design of new jetties at Speyside and Parlatuvier. Included construction supervision. |
Tobago House of Assembly/Montex Trinidad Ltd. | Design of Coastal Protection Works (rock revetment) at Queen’s bay, Tobago. |
Touchstone Exploration Ltd., Phillips Energy Ltd., Petrotrin, LGO Energy PLC, TN Ramnauth Ltd. | Various Wire line, fishing and chemical treatment jobs. |
TTYC | TTYC- installation and supervision of jetty piles-cast in place pilecaps. |
Water Taxi Service- Ministry of Works and Transport | Dredging of Flat Rock San Fernando. |
WET WORKS SOLUTIONS | Savonetta Piers 1 and 2 - Underside inspection of Piers 1 and 2 including recommendations for repairs/retrofit. |
World Wide Equipment | Dredging of Claxton bay facility. |
Zeeland Civil Engineering Ltd. | Inspection and Ultrasonic readings on steel piles. |